Home News Displaying items by tag: civil

Displaying items by tag: civil

<< Start < Prev 1 2 3 4 5 6 7 8 Next > End >>
Page 3 of 8
McConnell Dowell is pleased to announce that McConnell Dowell Constructors (Aust) Pty Ltd was awarded the 2009 Award for Excellence in Concrete in the Engineering Projects category by the Concrete Institute of Australia for work on the Meander Dam project in Tasmania. The award recognised the functional, aesthetic and economic worth of the project with particular emphasis on the appropriateness of concrete construction to the purpose of the structure. The project included the construction of a 47 m high roller compacted concrete (RCC) dam 180 m long across the top and capable of storing 43,000 ML. The dam configuration includes a central 50 m wide spillway to pass most floods whilst 1 Read more
The Company is pleased to announce that the Lake Manchester Dam Upgrade (LMDU) project received a High Commendation at the 2009 Engineers Australia Engineering Excellence Awards, Queensland Division, for Excellence in Project Infrastructure. The awards were announced on 2 October 2009 at the Queensland Engineers Australia Branch Annual Dinner. The Excellence Awards recognise the highest level of achievement in the engineering field. They provide peer recognition of outstanding engineering work as well as providing an opportunity to showcase and celebrate the invaluable contribution the engineering profession makes to the community. The LMDU involved the upgrade of an existing 90 year old mass concrete gravity dam. The work included the design and construction Read more
The Company is pleased to advise that Sino Iron Pty Ltd, a subsidiary of Hong Kong listed Citic Pacific Ltd, has awarded McConnell Dowell Constructors (Aust) Pty Ltd a contract for the construction of marine facilities associated with their Sino Iron Project. Citic Pacific Mining Management Pty Ltd. is acting as the principal’s representative. The Sino Iron Project, located at Cape Preston, approximately 1,500 km north of Perth, involves the establishment of an iron ore mine and related facilities, including marine loading and unloading facilities. McConnell Dowell’s works consist of  four separable portions: Installation of caissons for service wharf, construction of a module offload facility and installation of a desalination seawater intake; Construction Read more
The Company is pleased to announce that Built Environs Pty Ltd has been awarded the contract to build the new South Australian Police (SAPOL) headquarters in Adelaide by Commercial & General. The 10-storey concrete building (including basement) is being designed to achieve a five star Greenstar rating - including the use of natural energy for a healthy working environment - and will feature an open plan office space, curtain wall glazing and extra security features, including special ballistic bullet-proof glass. Built Environs will construct the building while maintaining emergency vehicle access to the rear of the South Australian Metropolitan Fire Service facility on Wakefield Street. Towards the end of the program Built Environs Read more
  The Company is pleased to announce the practical completion of the marine portion of the Common User Facility Project. The CUF project forms part of Techport Australia – the country's premier naval industry hub being developed at Osborne, South Australia.  The facility will support Australian Submarine Corporation to deliver the Royal Australian Navy’s next generation $8 billion Air Warfare Destroyers (AWD) and attract other shipbuilding and repair opportunities. The Common User Facility consists of three key areas, including the now-complete Marine works encompassing a wharf 213 m long and 25 m wide, and dredged access to the Port River shipping channel. Work on the runway and dry berth, as well as Australia’s largest Read more
The Marina Bay Sands project team in Singapore has achieved 500,000 man-hours without lost time injury. This is a major milestone for a Civil & Marine project in Singapore and even more significant due to the challenging nature of the work site which includes limited working areas and numerous interface issues with other contractors across all work fronts. To date the team have completed three deck and events plaza phases of the project and are now constructing the innovative and complex Crystal Pavilion Works which involves constructing two very large circular cofferdams and two complex and confined space reinforced concrete buildings over 24 m high within these cofferdams, all on an accelerated Read more
The Company is pleased to announce that MCJV, a joint venture between McConnell Dowell and Consolidated Contractors, has been awarded the contract to procure and construct the Komo Airfield in Papua New Guinea (PNG). Komo, which is located approximately 10 km south east of the Hydes Gas Conditioning Plant (HGCP) and the future Juha developments, has been selected as the site for the project airport to support the PNG LNG project which will develop gas and liquid hydrocarbon resources located in the southern highlands of Papua New Guinea. The PNG LNG Project is sponsored by a joint venture consisting of Esso Highlands Limited, Oil Search Limited (OSL), Santos, Nippon Oil, Mineral Read more
The Company is pleased to advise that Built Environs has achieved practical completion two weeks ahead of schedule on the Plant Accelerator project. The Plant Accelerator Building at the University of Adelaide’s Waite Campus at Urrbrae, South Australia, will be a world leading plant growth and analysis building that will accelerate pure and applied science research both Australia-wide and internationally. It is a two-level 4,485m2 crop research and plant breeding facility with the ability to process 160,000 plants a year in programs aimed at increasing drought and salinity tolerance in wheat and barley. The building includes over 1km of conveyor systems and state-of-the art imaging, robotic and computing equipment that Read more
The Company is pleased to announce the practical completion of the Western Sydney Recycled Water Initiative Project, with lines 2, 3 and 4 now fully connected. The existing sludge line (line 5) has also been upgraded to meet the higher pressures required for the current design. This project is a joint venture between McConnell Dowell, United Group Infrastructure and General Electric (Deerubbin Water Futures). McConnell Dowell’s scope of works consisted of the design and construction of the transfer system pipe work between Sydney’s sewerage treatment plants and the waste discharge pipe line to the Northern Suburbs Ocean Outfall Sewer (NSOOS). This will fulfil the NSW government’s commitment to provide environmental flows for Read more
The Company is pleased to advise that PT BlueScope Steel Indonesia has awarded PT McConnell Dowell Indonesia (PT MDI) the civil foundations package at their Cilegon plant, Indonesia. The works form part of BlueScope Steel's second metallic coating line expansion to take overall capacity from its current production of 140,000 tonnes per annum to 265,000 tonnes per annum of metallic coated and painted steel products. The Company is pleased to have won a further contract from BlueScope Steel, a valued customer, who the company has constructed various building, civil and mechanical packages over the last 17 years at their facilities in Indonesia, Thailand, Australia and New Zealand.           ENDS About McConnell Dowell Corporation Limited: Formed in Read more
<< Start < Prev 1 2 3 4 5 6 7 8 Next > End >>
Page 3 of 8

Quicklinks