Home News Marina Bay Sands Safety Achievement
Tuesday, 09 March 2010 18:32

Marina Bay Sands Safety Achievement

The Marina Bay Sands Project Team has achieved 750,000 man-hours LTI Free.

The current stage of this multi-phased project is the accelerated works program on the Crystal Pavilions and associated Marine dredging works.

The work environment under which these LTI Free man-hours were achieved are challenging in terms of the site working 24hrs; working within a large circular marine cofferdam with restricted access; working within confined spaces; multiple lifts from marine barges and landside cranes; large volumes of concrete pours and working from height on an ever-changing multi-storey building.

Achieving this safety result in this challenging work environment is a true acknowledgement to our people and their dedication and commitment to work together as a team to ensure all employees on this project go “Home Without Harm, Everyone Everyday”.

 

 

 

ENDS

About McConnell Dowell Corporation Limited:

Formed in 1960, McConnell Dowell is a world-class engineering, construction, building and maintenance group with projects throughout Australia, Asia, New Zealand, the Pacific and the Middle East.  For almost 50 years we have continually delivered the right engineering solutions for our public and private sector clients throughout our operating geographies.

McConnell Dowell’s diverse service offering includes building, civil, electrical, fabrication, marine, maintenance, mechanical, pipeline, rail and tunnelling infrastructure capabilities in the key market sectors of building, mining, oil and gas, petrochemical, power, public infrastructure, transport and water.

ENQUIRIES:

Angeleen Jenkins
Director / General Manager - New Business
McConnell Dowell Corporation Limited

P: +61 3 9816 2400 
F: +61 3 9819 4856 
E: This e-mail address is being protected from spambots. You need JavaScript enabled to view it

www.mcconnelldowell.com

Quicklinks