Home Corporate Public Infrastructure

The Barwon Heads Bridge, at the mouth of Barwon River, is an essential link in the road network of the Bellarine Peninsula. The existing road bridge, originally built in 1927, is rapidly reaching the end of its operational life. The results of a 2006 bridge inspection gave the bridge four to six more working years. The inspection identified extensive deterioration of the concrete deck, rotting and splitting of timber, rotting and cracking of piles, walers and cross-bracing and rusting and pitting of the steel beams. The load limit was reduced from 44 tonnes to 16 tonnes. The bridge carries vehicle, pedestrian and bike traffic, and is also used for fishing. It is regarded Read more
Resorts World at Sentosa Pte Ltd awarded McConnell Dowell the design and construct (D&C) contract for the Sentosa Seawall and Land Reclamation Project in Singapore.Resorts World are developing an integrated resort which will include six hotels, casino and a Universal Theme Park on Sentosa Island. The world-class and pioneering resort project is set on 49 hectares and is scheduled for opening in the first quarter of 2010. MacDow's contract included the design and construction of approximately 1.1 km of seawall, the reclamation of approximately 6.4 Read more
McConnell Dowell, in joint venture with our subsidiary Built Environs, was selected by DefenceSA to deliver the Common User Facility (CUF) project. The CUF project forms part of Techport Australia – the country's premier naval industry hub being developed at Osborne, South Australia.  The facility will support Australian Submarine Corporation to deliver the Royal Australian Navy’s next generation $8 billion Air Warfare Destroyers (AWD) and attract other shipbuilding and repair opportunities. Read more

Quicklinks